History and Evolution
Galvasa
- 1972
-
Ene 01
Foundation of Galvasa
The company was established with a surface area of 6,800 m2 and an industrial building of 1,200 m2
- 1988
-
Ene 01
Extension of Premises
The premises were extended to 11,800 m2 of land and 4000 m2 of industrial buildings
- 1990
-
Ene 01
Replacement of Furnace
Replacement of the fuel oil galvanizing furnace by natural gas and the installation of a waste heat recovery unit of exhaust gas
- 1991
-
Ene 01
New Gas Capture System
Design of a gas capture and filtration system Euro-in Technology
- 1992
-
Oct 04
Zero Dumping
Adaptation of processes to an Environmental Management System with zero dumping Installation of hood, filters and fluxing regenerator
- 1993
-
Oct 04
Creation of DICOME
Founding of DICOME, an auxiliary company manufacturing electrical material First environmental assessment by Novotec
- 1994
-
Oct 04
Extension od the Furnace
Extension of the galvanizing furnace to 12.5 x 1.75 x 2.5 m
- 1995
-
Oct 04
UNE-EN-ISO 9002 Certification
Quality System Certification according to UNE-EN-ISO 9002 by BVQI
- 1996
-
Oct 04
Euromanegement environment
Participation in the "Euromanagement environment" initiative of the European Commission to promote the implementation of EMS in SMEs
- 1997
-
Oct 04
Environmental Management System According to EMAS
Implementation of an Environment Management System according to EMAS European Regulation 1836/93 and Validation of the Environmental Declaration by BVQI
- 1998
-
Oct 04
Participation in European Craft and Inodgi programmes
Participation in the Bre-ct-97 5187 and In 20507 projects within Craft and Inodgi European programmes. Assessment of depleted stripping and emission control
- 1999
-
Oct 04
Extension of the Plot
Extension of our surface area to 25,800 m2 and of our a constructed surface area to 11,080 m2. Implementation of the Occupational Hazard Prevention System according to UNE 81.900
- 2000
-
Oct 04
Integrated Management System
Certification of the Occupational Hazard Prevention System by BVQI and unification with Quality and Environment in an Integrated Management System
- 2001
-
Oct 04
Eco-Efficiency Programme 2001
Restructuring of the load movement and material pre-processing systems with the extension of stripping work. This initiative was selected by the Fundación Entorno for its Eco-Efficiency Programme 2001 and financed by the General Directorate of Environmental Quality
- 2002
-
Oct 04
Adaptation to the OHSAS 18000 Standard
Adaptation of the Process Management System to the OHSAS 18000 Standard
- 2003
-
Oct 04
OHSAS 18000 Certification
Certification of the Integrated Management System with OHSAS 18000
- 2004
-
Oct 04
Extension and Adaptation of Pre-processing
Extension and adaptation of pre-processing to a length of 14.5 m
- 2005
-
Oct 04
PREMIER and ETHOS Programmes
Participation in the Total Quality PREMIER Programme and the Corporate Social Responsibility ETHOS Programme
- 2006
-
Oct 04
Fundación para la PRL, Ateg and Eurocualitas
Participation in the Occupational Hazard Prevention Programme of the Galvanization sector with the Fundación para la PRL, Ateg and Eurocualitas
- 2007
-
Oct 04
Integrated Environmental Authorization
Attainment of the Integrated Environmental Authorization
- 2008
-
Oct 04
Extension of the Pickling Installation
Extension of the stripping facility and circuit-II load movement facility
- 2009
-
Oct 04
Participation in the PREVEA Programme
Development of a project to implement a new processing line. Participation in the PREVEA programme on occupational hazard prevention
- 2011
-
Oct 04
Implementation of a new Galvanizing Line
Implementation of a new galvanizing line with a 14.5 x 2.1 x 3.5 m, furnace. Energy Saving and Efficiency Strategy Project, financed by the IDAE (MINER) and by the Department of Environmental Quality of the Aragón Provincial Council